CTB (CLEAR TO BUILD) RECOVERY

Know what you can build.
Know what stops you.

CTB Recovery combines BOM requirements, actual stock and live supplier data to calculate the real buildable quantity, expose exact blockers and identify the minimum recovery action.

Designed for EMS, NPI, Materials, Planning and Manufacturing Engineering teams.

VALIDATION CASE

Requested100
Buildable now42
After live recovery77
Optimized buy plan€317.54
€276.66 less than the non-optimized purchase plan
BOM + ERP stockWhat is really available?
Exact blockersWhich PNs cap the build?
Live sourcingMouser + DigiKey
Recovery targetBuy only what unlocks production

HOW IT WORKS

From raw files to a recovery decision.

01

Import

Load BOMs, ERP/material-master stock and optional physical stock or part-master mappings.

02

Calculate

CTB calculates the maximum finished quantity supported by every material requirement.

03

Expose blockers

Shortages are mapped to exact manufacturer part numbers with manufacturer safeguards.

04

Recover

Live supplier results are evaluated against MOQ, price breaks and the true recovery target.

CURRENT VALIDATION

42 → 77 units, without buying toward an unreachable 100.

In the current validation case, six blockers were identified. Live supplier checks showed five sourceable blockers. One part still capped the build at 77 units.

Instead of buying every sourceable shortage toward the full 100-unit request, CTB optimized the plan only to the confirmed 77-unit recovery ceiling.

€594.20 → €317.54Same confirmed build result. €276.66 of unnecessary purchasing deferred.

Validation data shown is a test case, not a customer claim. Supplier inventory and pricing are point-in-time and must be rechecked before ordering.

Requested build100
Immediate build42
Exact blockers6
Live-sourceable blockers5 / 6
Confirmed build after recovery77
Unresolved blockers1
Live supplier fusion: Mouser + DigiKey

DESIGNED TO FAIL SAFELY

Recovery data must be explicit, not optimistic.

Exact MPN + manufacturer guard

Shared MPN text across manufacturers is never silently accepted.

Unresolved stays unresolved

No-stock, not-found, ambiguous and API-error states remain visible.

No fake alternatives

Alternative parts require engineering approval; CTB does not silently substitute them.

PILOT PARTNERS WANTED

Challenge CTB with your own sanitized data.

We are looking for a small number of EMS/NPI/Materials teams willing to compare CTB Recovery with their current build-readiness process.

No CadBas dependency. XLSX or CSV is enough for a pilot.

Minimum pilot input

  • BOM: internal PN + quantity per finished unit
  • Stock export: internal PN + available quantity
  • Optional: MPN + manufacturer mapping
Email pilots@jurmiq.com